BATHROOM ACCESSORIES INSTALLATION 390 THB
What customers will receive
- This service covers installation of bathroom accessories
- Service fee includes labor cost only.
- 180-Day service warranty ensures high satisfaction.
- Servicing duration: 60 minutes
- Customers shall prepare the product.
If you need to install bathroom storage shelves but lack the tools, remember HomePro Installers. You can trust our standards; we're safe, and our technicians won't abandon the job.
Service Procedure
- Inspect and recommend the areas or positions of installation
- Remove the old accessories (if exists)
- Install the new bathroom accessories
- Recheck and test for safety and stability after installation
- Hand over the completed work to the customer along with providing suggestions and guidelines.
Terms and Conditions
- Rescheduling/alteration of the servicing date can be feasible at least 2 days prior to the servicing date.
- Liability coverage for any possible damages of items or properties caused by the team will be compensated according to the actual price but is limited to the twice amount of the service fee.
- The company reserves all rights to preclude these flowing circumstances.
- Customer hires third party/unaffiliated personnel to fix, alter, or modify the works of the company.
- Customer hires the company’s service team to perform or carry other tasks or procedures apart from what is stated in the service report sheet without informing the company or the company’s consent.
- Improper usage/maintenance, accidents or parts that exceed expiration date
- Service completion will be deemed final once the customer or induvial on behalf of the customer signs for the completion of service acceptance. There shall be additional charges for any further changes required by the customer.
- Inquiry of permits and security deposit with any government agencies, legal entity of housing estate/condominium, or neighbors must be handled and sorted out by the customer.
- For further inquiries or additional services, please reach out to “HomePro Service” counter at all HomePro stores or contact Call Center 1284 / Line ID: @changhomepro.
-
-
1
Electric wire VAF 2x2.5 Sq.mm.
metre
30
-
2
PVC tube size 1 1/2"
metre
70
-
3
PVC tube size 1/2"
metre
50
-
4
PVC tube size 1"
metre
60
-
5
PVC tube size 3/4"
metre
55
-
6
PVC ball valve
item
100
-
7
Metal Nipple Stainless size 1/2"
item
70
-
8
Gouging wall work, any kind of terrazzo floor for embedded sink
point
2500
-
9
Gouging wall, wooden floor, fiber works (for embedded sink)
point
1000
-
10
Three-pin plug+ box
set
200
-
11
Ground wire THW 1.5 Sq.mm.
metre
10
-
12
Electric wire Covering rail #4 plastic
metre
70
-
13
Ground Rod 30 cm.
point
200
-
14
Closing-opening Switch with Box
set
300
-
15
Tap
item
150
-
16
Ball valve
item
120
-
17
Breaker + box
set
150
-
18
Braid Stainless Steel size 12" to 18"
line
150
-
19
ชุดโครงเหล็ก Support สำหรับผนังกระจก, บล็อคแก้ว, โลหะ
set
1000
-
20
Gouge, drilling, ceiling repair (excluding painting).
point
300
CABINET RACK OR ACCESSORY INSTALLATION 390 THB
What customers will receive
- Cabinet rack and accessories installation
- Service fee includes labor cost only.
- 180-Day warranty
- Servicing duration: 40 - 60 minutes (depending on the installation area)
Reorganize and tidy up your kitchen with these cabinet racks and accessories for storing up various kitchenware and essentials, keeping them well organized and easily accessible. The installation of these cabinet racks and accessories however can be tricky as improper installation/set up could mean poor functionality, faulty content, etc. HomePro, henceforth, put forward a team of technicians with expertise in the certain field to get the job done flawlessly. Plus, tools and necessary equipment are supplied at HomePro.
Service Procedures
- Safety measures and protective equipment shall be implemented to prevent possible damage inflictions to customer’s properties.
- Carry out measurements and calculations on cabinet and required areas to determine the size and weight specifications. In case of incompatibility, installation accessories or modification shall be considered.
- Locate the ideal alignment for installation
- Execute assembly, fixation, etc. right after the positioning/alignment
- Run post-installation tests, tidy up work area and hand over to customer
Terms and Conditions
- Rescheduling/alteration of the servicing date can be feasible at least 2 days prior to the servicing date.
- Liability coverage for any possible damages of items or properties caused by the team will be compensated according to the actual price but is limited to the twice amount of the service fee.
- The company reserves all rights to preclude these flowing circumstances.
- Customer hires third party/unaffiliated personnel to fix, alter, or modify the works of the company.
- Customer hires the company’s service team to perform or carry other tasks or procedures apart from what is stated in the service report sheet without informing the company or the company’s consent.
- Improper usage/maintenance, accidents or parts that exceed expiration date
- In case of additional equipment provided by the customer, 50% of their total price or value will be additionally charged as the labor cost.
- Service completion will be deemed final once the customer or induvial on behalf of the customer signs for the completion of service acceptance. There shall be additional charges for any further changes required by the customer.
- Inquiry of permits and security deposit with any government agencies, legal entity of housing estate/condominium, or neighbors must be handled and sorted out by the customer.
- For further inquiries or additional services, please reach out to “HomePro Service” counter at all HomePro stores or contact Call Center 1284 / Line ID: @changhomepro.
-
-
1
Electric wire VAF 2x2.5 Sq.mm.
metre
30
-
2
PVC tube size 1 1/2"
metre
70
-
3
PVC tube size 1/2"
metre
50
-
4
PVC tube size 1"
metre
60
-
5
PVC tube size 3/4"
metre
55
-
6
PVC ball valve
item
100
-
7
Metal Nipple Stainless size 1/2"
item
70
-
8
Gouging wall work, any kind of terrazzo floor for embedded sink
point
2500
-
9
Gouging wall, wooden floor, fiber works (for embedded sink)
point
1000
-
10
Three-pin plug+ box
set
200
-
11
Ground wire THW 1.5 Sq.mm.
metre
10
-
12
Electric wire Covering rail #4 plastic
metre
70
-
13
Ground Rod 30 cm.
point
200
-
14
Closing-opening Switch with Box
set
300
-
15
Tap
item
150
-
16
Ball valve
item
120
-
17
Breaker + box
set
150
-
18
Braid Stainless Steel size 12" to 18"
line
150
-
19
ชุดโครงเหล็ก Support สำหรับผนังกระจก, บล็อคแก้ว, โลหะ
set
1000
-
20
Gouge, drilling, ceiling repair (excluding painting).
point
300
|